Contact Us
Index
Version 5.13
Version 6.0 Version 5.14 Version 5.12 Version 5.11 Version 6.1 Version 6.2 Version 6.3 Version 6.4 Version 20.1 Version 20.2 Version 20.3 Version 21.2 Version 22.1 Version 22.3 Version 22.4 Version 23.1 Version 23.2 Version 23.3 Version 23.4 Version 24.1 Version 24.2 Version 24.3 Version 24.4 Version 25.2
Contact Us
Wands for Oracle 5.13 – Home
Wands
Logging On
New Release Notification
User Profile
Responsibility Selection
Excel Not Ready Error
Add-In Load Error
Multiple Instances
License Key
License Key Errors
Insert Wands Function
Combine Text
Last Refreshed By
Last Refreshed Time
Split Text
Wands Tools
Snapshot
Upgrade Workbook
Shared Templates Drive
Drive Types
Dropbox
File Server
Oracle E-Business Suite Database
Navigator
Create a File
Delete a File
Edit a File
Open a File
Common Options
Administrator
Custom Drill Columns
Journal Custom Columns
Subledger Custom Columns
Subledger SLA Custom Columns
Add a Custom Drilldown Column
System Administrator Options
System Administrator License Key
System Administrator User Permissions
System Administrator User Options
System Administrator Product Options
System Administrator Delimiter Options
System Administrator Configuration Options
System Administrator Server Information
Wands Responsibility Profile Option
Payroll Drilldown Responsibility
Custom Options
Active Data Guard Support
About
Exit
Errors and Troubleshooting
Help and Shortcuts
GL Wand
Ledger and Segment Selector
Discover
Discover Period Names
Discover Segment Properties
Discover Child Ranges
Discover Segment Values
Expand and Explode
Expand Segment Values
Expand Segment Value Hierarchy
Expand Account Combination
Explode Segment Values
Explode Segment Value Hierarchy
Explode Account Combination
Discover Level
List of Values
List of Values – Create
Insert GL Wand Function
Account Combination Enabled
Account Combination End Date
Account Combination Start Date
Account Type
Daily Rate
Enabled Flag
Functional Currency
Get Balance
Descriptive Flexfield Criteria
Segment Combination Criteria
Get Balance Options
Get Balance Summary
Multiple Ledgers
Historical Rate
Ledger Name
Ledger Set
Next Segment Value
Parent Flag
Period Average Rate
Period End Date
Period Status
Period End Rate
Previous Segment Value
Period Name
Segment Description
Period Offset
Segment DFF
Period Start Date
Segment End Date
Segment Group
Segment Level
Segment Start Date
Calculating
Execute Drilldown
Drill Criteria Sheets
Drill Criteria – Balance
Drill Criteria – Journal Extract
Drill Using a Saved Template
Drill to Journal or Subledger
Analyze Balances
View Transaction R12
Support All Ledgers
Customize Drilldown
Edit Template Layout
Save Template Layout
Manage Templates
GL Wand Tools
Other Tools
Report Wizard
Hide Zeros
Import FSG
Configuration Sheet
Audit Get Balance
GL Wand User Options
GL Wand Drill Only
Report Distribution Manager
Create RDM Template
Source Report
Named Ranges
Parameters
Drilldowns
Email
Advanced Options
Edit RDM Template
Execute Report Distribution Manager
Load and Validation
Execution
Scheduler
Create Schedule
Running the Scheduler
RDM User Options
SMTP Email Settings
Budget Wand
Ledger Selector
Insert Budget Wand Function
Convert Get Balance
Load Budget
Load Option Selector
Loading Budgets
AutoPost Budget Wand Journals
Creating New Account Combinations
Budget Wand Tools
Budget Wand Requests
Budget Wand Messages
Budget Report Wizard
Budget Wand User Options
Reports Wand
Report
Open Existing Report
Create Report
Execute Report
Function
Insert a Run Report Function
Run Report Filter
Modify a Run Report Function
Drill On Function
Drill to Saved Template
Refresh
Refresh Mode
Refresh Reports Wand Functions
Show
Parameter List
Report Editor
Template Manager
Reports Wand Tools
Clean Template
Show List of Values
Create List of Values
Reports Wand User Options
Administration
Report Definition
Create
Bind Variables
Bind Variable Errors
Custom SQL List of Values
Filters
SQL Errors
Edit
Security
Mass Administration
Import
Import Single to Excel
Import All to Excel
Process
Process All
Process Single
Upgrade
Upgrade Version 4 Report Definitions
Fixing Duplicate Bind Variables
Upgrade Version 4 Templates
Upgrade Reports Wand Administrator Templates
NoetixViews
Import NoetixViews Report Definitions to Excel
Refresh NoetixViews Security Manager
Essays
Discoverer Converter
Convert using Discoverer Plus (.xml) Export
Export Workbook .xml From Discover Plus
Using the Discoverer Converter
Assign Reports
Refresh List
PL/SQL Stored Procedures
Reports Wand Database Package
Create a Stored Procedure
Assign a Stored Procedure
Exception Handling
Journal Wand
Journal Wand Ledger Selector
Create Journal Wand Template
Edit Journal Wand Template
Create Journal Wand Template from Drilldown
Populate Journal Wand Template
Account Combinations
Descriptive Flexfields
Journal Attachments
Load Options
Loading Journals
AutoPost Journal Wand Journals
Journal Wand Tools
Journal Wand Requests
Journal Wand Messages
Journal Wand User Options
chat icon - ignore
Live Chat
Chat Offline

Create Schedule

To schedule a RDM template, navigate to RDM | Scheduler | Create. You will be presented with a form to help create the template.

RDM Template

Select the RDM Template you would like to schedule by clicking on the file navigation   or Shared Templates Drive  icon.

Your RDM template must have valid RDM data on each sheet in the workbook otherwise an error will occur when the scheduler runs.

Schedule Pattern

You can choose to schedule the RDM Template one time, or on an Hourly, daily, weekly, or monthly schedule:

  • If you select the One time radio button, you choose a date and time to run the RDM Template.
  • If you select the Hourly radio button, you choose the recurrence interval for the job and the date and time to start the RDM Template. An interval of 1 produces an hourly schedule and an interval of 2 produces an every other hour schedule. The task will start at the specified time according to the increments of recurring hours.
  • If you select the Daily radio button, you choose the recurrence interval for the job and the date and time to start the RDM Template. An interval of 1 produces a daily schedule and an interval of 2 produces an every other day schedule. The task will start at the specified time each day.
  • If you select the Weekly radio button, you choose the recurrence interval for the task, the date and time to start the task, and the days of the week in which to start the RDM Template. An interval of 1 produces a weekly schedule and an interval of 2 produces an every other week schedule. The task will start at the specified time on each of the specified days.
  • If you select the Monthly radio button, you choose the months in which you want to start the task and the days of the months and the days of the week for each month in which you want to start the RDM Template. You can also specify that you want to start the RDM Template on the last day of each month.

Recurrence

Set the start date and time for the task, you can optionally set an end date for your schedule that will cause the schedule to expire, when a job is expired, the RDM Template will not run.

Task Status Notification

You can choose to receive an email notification on the completion of a scheduled task, enter multiple email addresses separated by a “;” or a “,”. If you wish to only be notified when a task completes with an error, set the “Notify on error only” check box.

The Task Status Notification requires that the user has completed the RDM User Options email settings. Please confirm your settings by selecting the Options menu from the RDM Tools ribbon.

You can now click Create and a new workbook containing the RDM Scheduler template will be created.

RDM Scheduler Template

This is a normal Excel workbook. However the structure must not be changed. The only changes that you may make to this workbook are to insert more lines. Any other changes will most likely corrupt the definition and Reports Distribution Manager will give an error when you try to run the scheduler.

The RDM Scheduler template has three visible columns, RDM Template, Schedule and Enabled:

  • The RDM Template column displays the absolute path and name or the link (if RDM Template is selected from Shared Template Drive) of the RDM Template associated with the schedule job.
  • The Schedule column holds only a text description of the schedule and will change in accordance with modifications to the schedule.
  • The Enabled column allows you to enable or disable the schedule job. A job that is enabled can run, a job that is disabled will not be scheduled and cannot run until it is enabled.

Edit Schedule

You can modify a schedule by double clicking the row or by selecting the row you wish to edit, then navigate to RDM | Scheduler  and select the Edit icon.

Run The Scheduler


Once you have created your schedule your are ready to run the scheduler.