Contact Us
Index
Version 25.2
Version 20.3 Version 20.4 Version 21.1
Contact Us
Wands for Oracle Cloud 25.x – Home
Wands
Installation
Platform Logon
Insert insightsoftware Function
Combine Text
Last Refreshed By
Split Text
Last Refreshed Time
Tools (Wands)
Snapshot
Common Options
Shared Templates Drive
Edit a File
File Server
Oracle Cloud Connector Database
Navigator
Open a File
Create a File
Drive Types
Dropbox
Delete a File
Administrator
System Administrator Options
System Administrator Delimiter Options
System Administrator Configuration Options
System Administrator User Options
System Administrator Server Information
About
Lineos
Exit
Help and Shortcuts
Excel Error
GL Wand
Ledger and Segment Selector
Discover
Discover Period Names
Discover Segment Properties
Expand and Explode
Explode Segment Values
Explode Segment Value Hierarchy
Expand Segment Value Hierarchy
Expand Segment Values
Discover Segment Values
Discover Level
List of Values
List of Values – Create
Insert GL Wand Function
Period Name
Ledger Name
Segment Description
Ledger Set
Segment End Date
Next Segment Value
Account Type
Segment Tree
Parent Flag
Enabled Flag
Segment Start Date
Get Balance
Multiple Ledgers
Get Balance Options
Financial Category
Period Offset
Functional Currency
Previous Segment Value
Period End Date
Period Start Date
Period Name by Date
Calculating
Execute Drilldown
Drill Using a Saved Template
Analyze Balances
Drill to Journal or Subledger
Drill Criteria Sheets
Drill Criteria – Journal Extract
Drill Criteria – Balance
Customize Drilldown
Edit Template Layout
Save Template Layout
Manage Templates
GL Wand Tools
GL Wand User Options
Other Tools
Hide Zeros
Report Distribution Manager
Create RDM Template
Advanced Options
Email
Drilldowns
Parameters
Source Report
Named Ranges
Edit RDM Template
Execute Report Distribution Manager
Execution
Load and Validation
Scheduler
Running the Scheduler
Create Schedule
RDM User Options
SMTP Email Settings
chat icon - ignore
Live Chat
Chat Offline

Running the Scheduler

To start the RDM Scheduler, navigate to RDM | Scheduler | Start. The scheduler will load the scheduler tasks from the active RDM Scheduler Worksheet and proceed to schedule enabled tasks.

When the scheduler is running it displays the date and time the job was started, plus additional information regarding the next task scheduled to execute:

Field Name Value
Next Task Name of the next RDM Template scheduled to execute.
Task Source The Excel row number that stores the next task to execute.
Next Task Start Time The start date and time of the next task to execute.
Wait Amount of time in days, hours and minutes before the next task is executed.

To stop the RDM Scheduler, select the Stop button, the scheduler will then update the RDM Scheduler template with the last execution time of all tasks that were executed during the running of the scheduler.

Any RDM Template that completes with an error will be indicated on the RDM Scheduler template by highlighting the specific row in red and including a note with the particular error.

Once the scheduler is started you cannot use the workstation and you must leave Excel as the active application with the focus. The workstation running the Scheduler can be locked but must remain active, please ensure your Windows Power Options prevent your workstation from switching to sleep mode.